Sewage pipe fill

Sewage pipe fill - the task

This is the task - to fill the bottom of this sewage pipe item with CFC cellular concrete.

Sewage pipe fill - CFC mixture just expanded

The sewage item bottom is filled with CFC-500 and the mixture has just expanded. In two hours we cut off the top.

Sewage pipe fill - CFC cap is cut off

The top has beem cut off. The extra material is used again for the next fill.

Designer's corner

Sewage pipe fill - design

Here is the sewage pipe item in drawing. The CFC material is used as fill at the bottom of the design element.